Hi,
I’m designing a garden office / workspace and I’m using Open Cutlist to generate a list of required materials.
I’ve defined all the relevant materials e.g. OSB 18mm / OSB 19mm / CLS 4x2 etc and nicely generates a summary list of required materials.
However, when I then generate the individual cutting diagrams, the amount of required materials is often significantly lower than the amount on the summary list.
For instance:
For
OSB 9x1200x2400mm
Summary = 23 boards
Cutting diagram = 14 boards
CLS 4x2 / 3000mm
Summary = 93 pieces
Cutting Diagram = 57
any idea, what causes that amount of different and how I can get just one correct number?
I’ve attached the sketchup file for reference …
thanks,
Phil